What Awaab's Law Phase 2 Means for Damp and Mould
The first phase of Awaab’s Law came into force for social landlords in England in October 2025. It sets legal timescales for investigating and fixing serious hazards in tenants’ homes, which, until now, applied to serious damp and mould problems, and emergencies that need dealing with within 24 hours, however, on 30 November 2026, Phase 2 extends the same timescales to seven more types of hazards.
In this article we explain what Awaab's Law is, what's changing, what the timescales mean in practice, and how to get the right surveys and contractors in place before the reports come in.
What is Awaab’s Law?
Awaab’s Law is a set of legal timescales that social landlords in England must meet when a tenant reports a hazard in their home. It applies to local authorities and housing associations.
An emergency hazard could cause harm if it isn't dealt with within 24 hours. Government guidance gives examples such as a gas or carbon monoxide leak, a broken boiler, exposed wiring, a major water leak, an external door that won't lock, or widespread damp and mould that's affecting someone's health. Emergency hazards of every type have been covered since Phase 1.
A significant hazard poses a serious risk to the tenant's health or safety, but with a little more time to act. The guidance describes it as something a reasonable landlord would make safe within 15 working days. These can be reported without any signs of damp and mould, as they will be hazards in their own right.
Landlords will need to investigate within a set timeframe, inform the tenant what they’ve found, advise of the next steps and carry out remedial works to make the home safe. They must also start work to stop the problem coming back.
The law is being introduced in three phases:
Phase 1 (from 27 October 2025): concerning damp and mould that poses a serious risk to health, plus emergencies of any kind
Phase 2 (from 30 November 2026): includes seven more types of hazard (explained below)
Phase 3 (expected in 2027): includes almost all the remaining hazards in the Housing Health and Safety Rating System (HHSRS), except overcrowding
The HHSRS is the government's system for assessing risks to health and safety in homes and covers a wide range of hazards.
What changes are coming for Awaab’s Law Phase 2 on 30 November 2026 and what are the timescales?
From 30 November, the timescales that currently apply to significant damp and mould hazards will also apply to these seven types of hazard:
- Excess cold
- Homes that are too cold to keep warm enough to stay healthy. This could be due to poor insulation, faulty heating, or draughty windows and doors.
- Excess heat
- Homes that get too hot. This could be because the heating can’t be turned down, no ventilation, or large windows (especially in summer).
- Falls
- Homes that have risks of falls. This could be due to uneven flooring, missing handrails, or broken steps.
- Structural collapse and falling elements
- Homes where part of the building could collapse or fall. This could be due to loose roof tiles, unstable chimney, or a sagging ceiling.
- Fire and explosions
- Homes that have risks of a fire starting or spreading, or of an explosion. This could be due to fire doors not closing, a blocked escape route, or faulty gas appliances.
- Electrical hazards
- Homes that have risks of electrical shock or burns. This could be due to old or damaged wiring, broken sockets, or water getting into electrics.
- Domestic hygiene, including pests and food safety
- Homes that stop tenants keeping their homes clean. This could be due to pests, blocked drains, or a kitchen without safe facilities for storing and cooking food.
The timescales stay the same as Phase 1, they will simply apply to additional hazards. Landlords must:
- Investigate emergency hazards and make the home safe within 24 hours of becoming aware of them
- Investigate significant hazards within 10 working days of becoming aware of them
- Give the tenant a written summary of what they found, and what they plan to do, within 3 working days of the investigation ending
- Complete the work needed to make the home safe within 5 working days of the investigation ending
- Start work to stop the hazard coming back within 5 working days, or as soon as reasonably practicable and within 12 weeks
If safety work can't be done in time, the landlord must arrange suitable alternative accommodation for the household at its own cost within 24-hours, until the work is finished.
How Phase 2 affects damp and mould cases
Most surveyors will tell you that damp and mould are often a sign of a wider problem with the building.
For example, if a tenant has reported black mould in a bedroom, the surveyor may find that the walls have little insulation, a blocked gutter is letting rainwater soak into the plaster, and the water has reached a light switch. Before 30 November 2026, the landlord's Awaab's Law duties would relate to the mould. After 30 November 2026, the same visit could also identify excess cold and electrical hazards, each with its own timescales.
Investigations need to look for the cause, and landlords need to keep records of what they’ve found and what the remedial actions are.
For residents, damp, mould and cold homes can affect health, wellbeing and quality of life, particularly for children, older people and vulnerable residents. Identifying and addressing the root cause helps create safer, healthier homes while reducing the likelihood of repeat repairs and disruption.
Have contractors in place before the reports arrive
Meeting these timescales above depends on having the right surveys, inspections and contractors ready to go. Running a full tender for each job isn't realistic when safety work may need to be completed within five working days.
Frameworks help close that gap.
Contractors and suppliers appointed to NPA frameworks have already undergone a thorough procurement and evaluation process, including assessments of their technical capabilities, relevant accreditations and quality standards. This gives landlords access to experienced, pre-assessed companies through a compliant procurement route, helping them appoint the right specialists without starting the procurement process from scratch. For damp and mould work, the most relevant routes are:
- Asset Safety and Compliance (ASC1) for building health surveys, inspections, ventilation and property protection
- Roofing Systems and Associated Works (RS5) for roof repairs and replacement
- Refurbishment and Modernisation (RM3) for wider improvement works
- Retrofit and Decarbonisation (N9) for insulation and heating upgrades
We looked at how these frameworks work together in our article on future-proofing housing stock through asset management and compliance.
Find out more about damp and mould with our lunch & learns
We’re running two lunch and learn seminars with two of our appointed companies, looking at practical ways to prevent damp and mould and address some of its underlying causes.
Awaab’s Law: Is your Damp & Mould Strategy Proactive or Reactive?
Explore how housing providers can move from reactive damp and mould repairs towards earlier intervention, including how environmental monitoring can identify changes in humidity, temperature and CO₂ before problems escalate.
Managing Roof Assets: A Practical Guide to Inspection, Maintenance, and Refurbishment
Learn about common causes of water ingress, spotting early signs of roof deterioration and using inspections, planned maintenance and refurbishment to tackle problems at source. The session will also cover insulation upgrades and improving thermal performance.
These hour-long sessions are conveniently held at your offices during lunch-time. If you’d like to register your interest for one, or both, seminars, please get in touch.
Alternatively, if you’re an Appointed Contractor and want to work with us to provide a lunch & learn, please speak to your Client Support Officer.